The completed roof seen from above, new shingles across the hip and down the slopes.
LC-2026-07
WEEHAWKEN, NJ · COMPLETED · FULL ROOF REPLACEMENT WITH NEW DECKING, CHIMNEY CRICKET, AND VENTILATION

Full Roof Replacement on a Steep Slope in Weehawken, NJ

Landstar Construction stripped several layers of old shingles from one of the steepest roofs it has worked, reinforced the original plank decking with new plywood, and rebuilt the roof with drip edge, ice and water shield, synthetic underlayment, new shingles and ridge caps, plus new ventilation and a new chimney cricket.

Landstar replaced a very steep Weehawken roof, stripping multiple shingle layers to the original plank decking, adding new plywood, then rebuilding with ice and water shield, underlayment, new shingles, ridge caps, ventilation and a chimney cricket.

BEFORE & AFTER

Before / After.

The same slope finished in new architectural shingles against the side wall and chimney. AFTER
PROJECT SNAPSHOT
LOCATION
Weehawken, NJ
PROJECT TYPE
Full Roof Replacement
ROOF CHARACTER
Very steep slope, original plank decking
SCOPE
Tear-off, new plywood, ice and water shield, shingles, ventilation, chimney cricket
STATUS
Completed
THE WORK, STAGE BY STAGE

How it came together.

01 / THE EXISTING ROOF

Multiple shingle layers coming off down to the original planks.

The worn original shingles running down the steep slope toward the street below.
The original shingle surface
Old shingles stripped back in one section to reveal the original plank decking beneath.
Stripping back to the planks
The weathered existing roof with a strip of bare plank decking opened along the slope.
Plank decking exposed
Old shingle layers pulled off the steep slope, exposing the original board decking.
Layers off the steep slope
02 / NEW DECKING

New plywood laid over the reinforced plank decking.

New plywood sheets laid over the original planks on the steep slope, a roofer working above.
Plywood over the original planks
New plywood decking running up to the ridge in the narrow gap between two houses.
Decking up to the ridge
The whole steep slope covered in new plywood decking, the street and rooftops below.
The full slope decked
03 / UNDERLAYMENT

Ice and water shield and synthetic underlayment over the new deck.

Underlayment and metal valley flashing running down the slope above the parked cars.
Valley flashing and underlayment
Synthetic underlayment rolled out across the steep slope against open sky.
Underlayment across the slope
Underlayment laid up to the wall behind the chimney, materials staged on the slope.
Detailing up to the wall
04 / VENTILATION

New power venting set into the roof.

A new domed power vent set into the new shingles near the ridge.
New power vent
05 / FINISHED

New shingles and ridge caps across the completed roof.

New architectural shingles finished against the tall side wall and the chimney.
Finished against the side wall
The finished slope in new shingles, dark wall flashing running up beside the chimney.
Wall flashing beside the chimney
The completed roof seen from above, new shingles across the hip and down the slopes.
The finished roof from above
New shingles across the finished roof, neighboring rooftops falling away below.
Looking out over the neighborhood
The finished shingle surface meeting the siding wall, new flashing along the join.
Shingles meeting the wall
A long run of new shingles climbing the steep slope to the ridge.
The run up to the ridge
SCOPE OF WORK

What we did.

For this Weehawken project Landstar completed a full roof replacement. The crew removed multiple layers of old shingles, reinforced the existing plank decking, and installed new plywood over it. The roof was then rebuilt with drip edge, ice and water shield, synthetic underlayment, new shingles and ridge caps. New power and ridge vents were installed, and a new chimney cricket was built to divert water around the chimney. The photographs follow the job through every stage, from the worn original surface and the exposed plank decking to the new plywood, the underlayment, the ventilation and the finished shingles.

WHY IT MATTERS

Why it matters.

Pitch changes a roof replacement more than most homeowners expect. A steep slope sheds water fast, which is good, but it also means every fastener is working harder, every course has to be set precisely, and the crew has to stage and secure the job before a single shingle is laid. It also makes what is underneath matter more. Original plank decking with gaps between the boards gives fasteners an inconsistent hold, and on a slope this severe that is the difference between a roof that stays put in wind off the Hudson and one that starts lifting at the edges. Covering the planks in new plywood first is the step that makes everything above it work.

MATERIALS / SYSTEM DETAILS

What went into it.

  • New plywood decking over reinforced planks
  • Drip edge
  • Ice and water shield
  • Synthetic underlayment
  • Architectural shingles
  • Ridge caps
  • Power vent and ridge ventilation
  • New chimney cricket